StartT_Agglomerations › EL23301601

aggC1 61
aggC2 39
aggCalculation The method was based on permanent population data (census 2011) supplemented by seasonal population (principally on the basis of accommodation facilities) and wherever applicable industrial contribution. In some cases the above findings were verified with the aid of the number of water meters indicative of the number of households, commercial facilities etc, served and on the basis of appropriate number of people per household.
aggChanges no
aggCode EL23301601
aggGenerated 10306
aggLatitude 37.9367
aggLongitude 21.2608
aggMethodC1 E
aggMethodC2 E
aggName LECHENA
aggNUTS EL633
aggPercPrimTreatment 39
aggPeriodOver 20051231000000
aggRemarks The communal wastewater treatment plant is operational. The 39% of the generated sewage is and will continue to be treated by a system of septic tank-cesspool untile the completion of the collecting system.
aggSewageNetwork S
aggState 1
repCode EL_UWWTD_2020
rptMStateKey GR
aggDateArt3 12/31/05 00:00:00
aggDateArt4 12/31/05 00:00:00
aggHyperlink http://astikalimata.ypeka.gr/Services/Pages/AgViewApp.aspx

Connected to the following UWWTPS (table T_UWWTPAgglos)
aucUwwCode EL233016019 aucUwwName LECHENA

Connected to the following UWWTPS (table T_UWWTPS)
uwwCode EL233016019 uwwName LECHENA