StartT_Agglomerations › LU_AGGL_124_01

aggBestTechnicalKnowledge 1
aggC1 99
aggC2 1
aggCalculation generated load = at least resident population + seasonal changes + industrial waste water connected
aggChanges yes
aggChangesComment A new UWWTP (Grevenmacher) started working in May 2018 and treated all the waste water issued from the municipalities of Wasserbillig, Mertert, Grevenmacher. The new capacity is 47000 p.e.
aggCode LU_AGGL_124_01
aggDilutionRates 1
aggExistMaintenancePlan 1
aggExplanationOther monitoring of flow
aggGenerated 8128
aggHaveRegistrationSystem 1
aggLatitude 49.706675
aggLongitude 6.485605
aggMethodC1 E
aggMethodC2 E
aggName Mertert
aggNUTS LU000
aggOtherMeasures 1
aggPeriodOver 19990101000000
aggPressureTest 1
aggRemarks for all agglomerations the aggPeriodOver should be 31-12-1998. The agglomeration of Grevenmacher has several sub agglomerations (commune of Wasserbillig, Mertert, Grevenmacher, Stadtbredimus, Lenningen, Manternach and Wormeldange). All these small sub agglomerations have there own collecting system already in place. It is foreseen to connect all these sub agglomerations via a new sewer pipe to a new UWWTP to be build in the agglomeration of Grevenmacher.
aggSewageNetwork B
aggState 1
aggVideoInspections 1
repCode LU100
rptMStateKey LU
aggDateArt3 01/01/99 00:00:00
aggDateArt4 01/01/99 00:00:00

Connected to the following UWWTPS (table T_UWWTPAgglos)
aucUwwCode LU_STEP_124_B001 aucUwwName Grevenmacher

Connected to the following UWWTPS (table T_UWWTPS)