StartT_Agglomerations › LU_AGGL_125_01

aggBestTechnicalKnowledge 1
aggC1 99.5
aggC2 0.5
aggCalculation generated load = at least resident population + seasonal changes + industrial waste water connected
aggChanges yes
aggChangesComment Since April 2016 a new wastewater treatment plant with a capacity of 9000 p.e is workingin the test run, but achieve yet now high treatment performance
aggCode LU_AGGL_125_01
aggDilutionRates 1
aggExistMaintenancePlan 1
aggExplanationOther monitoring of flow
aggGenerated 4254
aggHaveRegistrationSystem 1
aggLatitude 49.721192
aggLongitude 6.249453
aggMethodC1 C
aggMethodC2 C
aggName Junglinster
aggNUTS LU000
aggOtherMeasures 1
aggPeriodOver 19990101000000
aggPressureTest 1
aggRemarks for all agglomerations the aggPeriodOver should be 31-12-1998
aggSewageNetwork B
aggState 1
aggVideoInspections 1
repCode LU100
rptMStateKey LU
aggDateArt3 01/01/99 00:00:00
aggDateArt4 01/01/99 00:00:00

Connected to the following UWWTPS (table T_UWWTPAgglos)
aucUwwCode LU_STEP_125_B005 aucUwwName Junglinster

Connected to the following UWWTPS (table T_UWWTPS)