StartT_Agglomerations › LU_AGGL_136_01

aggBestTechnicalKnowledge 1
aggC1 99
aggC2 1
aggCalculation generated load = at least resident population + seasonal changes + industrial waste water connected
aggChanges yes
aggChangesComment Since April 2010 the new UWWTP is operational and is able to treat 99% of the agglomeration of Remich. The UWWTP is located in Perl-Besch (Germany). The capacity of the new UWWTP is 23000 p.e. The generated load with reserve capacity from the cities Remich, Schengen, Remerschen, Wintrange, Wellenstein, Bech-Kleinmacher and Schwebsingen is estimated with 15410 p.e
aggCode LU_AGGL_136_01
aggDilutionRates 1
aggExistMaintenancePlan 1
aggExplanationOther monitoring of flow
aggGenerated 8252
aggHaveRegistrationSystem 1
aggLatitude 49.51097
aggLongitude 6.36047
aggMethodC1 E
aggMethodC2 E
aggName Remich
aggNUTS LU000
aggOtherMeasures 1
aggPeriodOver 19990101000000
aggPressureTest 1
aggRemarks for all agglomerations the aggPeriodOver should be 31-12-1998. All the waste water of this agglomeration is already connected via sewer pipe to the new international UWWTP in the agglomeration of Perl-Besch (Germany).
aggSewageNetwork B
aggState 1
aggVideoInspections 1
repCode LU100
rptMStateKey LU
aggDateArt3 01/01/99 00:00:00
aggDateArt4 01/01/99 00:00:00

Connected to the following UWWTPS (table T_UWWTPAgglos)
aucUwwCode LU_STEP_136_B001 aucUwwName Perl-Besch

Connected to the following UWWTPS (table T_UWWTPS)