StartT_Agglomerations › NO-06-012

aggC1 98
aggC2 1
aggCalculation The general calculation scheme, ref ns9426
aggChanges no
aggCode NO-06-012
aggGenerated 7000
aggLatitude 60.865576
aggLongitude 8.559616
aggMethodC1 E
aggMethodC2 E
aggMethodWithoutTreatment E
aggName Hemsedal
aggNUTS NO03
aggPercWithoutTreatment 1
aggPeriodOver 20030919000000
aggState 1
repCode NO_UWWTD_2018
rptMStateKey NO
aggDateArt3 12/31/98 00:00:00
aggDateArt4 09/19/03 00:00:00

Connected to the following UWWTPS (table T_UWWTPAgglos)
aucUwwCode NO3042.0008.01 aucUwwName Trøim avløpsanlegg

Connected to the following UWWTPS (table T_UWWTPS)
uwwCode NO3042.0008.01 uwwName Trøim avløpsanlegg