StartT_UWWTPS › ATTP_3-408

aggCode ATAG_3-408
repCode AT_UWWTD_2019_1
rptMStateKey AT
uwwBeginLife 12/31/06 00:00:00
uwwBOD5Perf P
uwwBODDischargeMeasured 3
uwwCapacity 10270
uwwCODDischargeMeasured 23
uwwCode ATTP_3-408
uwwCODPerf P
uwwCollectingSystem ISCON
uwwLatitude 47.628402092
uwwLoadEnteringUWWTP 10864
uwwLongitude 16.129943598
uwwMethodWasteWaterTreated M
uwwName ARA AV Grimmenstein-Edlitz-Thomasberg
uwwNDischargeMeasured 3
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS AT122
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks The higher load treated in contrast to the UWWTP capacity does not represent a drawback for reaching the required effluent concentrations and/ or required minimum percentage rates of reduction for BOD5 and COD. In case an UWWTP is operated technically sound, it is possible to reach the required treatment performance even in those cases, where the UWWTP – design capacity is temporarily exceeded (e.g. in touristic seasons).
uwwSecondaryTreatment 1
uwwState 1
uwwTSSPerf NR
uwwWasteWaterTreated 1380504

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode ATAG_3-408 aucAggName Raum Grimmenstein (Grimmenstein-Grimmenstein)