aggCode ATAG_3-65
repCode AT_UWWTD_2019_1
rptMStateKey AT
uwwBeginLife 12/31/06 00:00:00
uwwBOD5Perf P
uwwBODDischargeMeasured 1
uwwCapacity 10000
uwwCODDischargeMeasured 12
uwwCode ATTP_3-65
uwwCODPerf P
uwwCollectingSystem ISCON
uwwLatitude 48.230352633
uwwLoadEnteringUWWTP 11676
uwwLongitude 14.536085
uwwMethodWasteWaterTreated M
uwwName ARA GAV Ennsdorf-St.Pantaleon
uwwNDischargeMeasured 3
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS AT121
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks The higher load treated in contrast to the UWWTP capacity does not represent a drawback for reaching the required effluent concentrations and/ or required minimum percentage rates of reduction for BOD5 and COD. In case an UWWTP is operated technically sound, it is possible to reach the required treatment performance even in those cases, where the UWWTP – design capacity is temporarily exceeded (e.g. in touristic seasons).
uwwSecondaryTreatment 1
uwwState 1
uwwTSSPerf NR
uwwWasteWaterTreated 610677

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode ATAG_3-65 aucAggName Raum St. Pantaleon-Erla (St. Pantaleon-St. Pantaleon)