StartT_UWWTPS › ATTP_3-730

aggCode ATAG_3-730
repCode AT_UWWTD_2019_1
rptMStateKey AT
uwwBeginLife 12/31/06 00:00:00
uwwBOD5Perf P
uwwBODDischargeMeasured 3
uwwCapacity 6500
uwwCODDischargeMeasured 11
uwwCode ATTP_3-730
uwwCODPerf P
uwwCollectingSystem ISCON
uwwLatitude 47.686783143
uwwLoadEnteringUWWTP 6733
uwwLongitude 16.130166468
uwwMethodWasteWaterTreated M
uwwName ARA GAV Mittleres Pittental
uwwNDischargeMeasured 1
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS AT122
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks The higher load treated in contrast to the UWWTP capacity does not represent a drawback for reaching the required effluent concentrations and/ or required minimum percentage rates of reduction for BOD5 and COD. In case an UWWTP is operated technically sound, it is possible to reach the required treatment performance even in those cases, where the UWWTP – design capacity is temporarily exceeded (e.g. in touristic seasons).
uwwSecondaryTreatment 1
uwwState 1
uwwTSSPerf NR
uwwWasteWaterTreated 505023

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode ATAG_3-730 aucAggName Raum Scheiblingkirchen/Thernberg (Mittleres Pittental)