StartT_UWWTPS › EL1260130131

aggCode EL12601301
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 10000
uwwCode EL1260130131
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2025. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 40.91737943
uwwLongitude 23.50671456
uwwName NIGRITA
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL526
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL12601301 aucAggName NIGRITA