StartT_UWWTPS › EL2310210119

aggCode EL23102101
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 13000
uwwCode EL2310210119
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 38.40539979
uwwLongitude 21.25094774
uwwName INIADES
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL631
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL23102101 aucAggName NEOCHORI