StartT_UWWTPS › EL23301001070111

aggCode EL233010010701
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 12833
uwwCode EL23301001070111
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 37.8223667
uwwLongitude 21.24047081
uwwName GASTOUNI
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL633
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSandFiltration 1
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA
uwwUV 1

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL233010010701 aucAggName GASTOUNI - VARTHOLOMIO