StartT_UWWTPS › EL2420120128

aggCode EL24201201
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 12000
uwwCode EL2420120128
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 38.9932
uwwLongitude 23.1601
uwwName ISTIEA
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL642
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL24201201 aucAggName ISTIEA