StartT_UWWTPS › EL2420180130

aggCode EL24201801
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 6000
uwwCode EL2420180130
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 38.02749289
uwwLongitude 24.30575721
uwwName MARMARI
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL642
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL24201801 aucAggName MARMARI