StartT_UWWTPS › EL411015015

aggCode EL41101501
repCode EL_UWWTD_2020
rptMStateKey GR
uwwBOD5Perf NA
uwwCapacity 8915
uwwCode EL411015015
uwwCODPerf NA
uwwCollectingSystem NOTCON
uwwHyperlink http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx
uwwInformation The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool.
uwwLatitude 39.31644626
uwwLongitude 26.18096677
uwwName PETRA
uwwNRemoval 1
uwwNTotPerf NR
uwwNUTS EL411
uwwOtherPerf NR
uwwOtherTreatment 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwSecondaryTreatment 1
uwwState 2
uwwTSSPerf NA

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode EL41101501 aucAggName PETRA