aggCode | EL41101501 |
---|---|
repCode | EL_UWWTD_2020 |
rptMStateKey | GR |
uwwBOD5Perf | NA |
uwwCapacity | 8915 |
uwwCode | EL411015015 |
uwwCODPerf | NA |
uwwCollectingSystem | NOTCON |
uwwHyperlink | http://astikalimata.ypeka.gr/Services/Pages/WtpViewApp.aspx |
uwwInformation | The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Until the communal wastewater treatment plant is operational all the generated sewage is and will continue to be treated by a system of septic tank-cesspool. |
uwwLatitude | 39.31644626 |
uwwLongitude | 26.18096677 |
uwwName | PETRA |
uwwNRemoval | 1 |
uwwNTotPerf | NR |
uwwNUTS | EL411 |
uwwOtherPerf | NR |
uwwOtherTreatment | 1 |
uwwPrimaryTreatment | 1 |
uwwPTotPerf | NR |
uwwSecondaryTreatment | 1 |
uwwState | 2 |
uwwTSSPerf | NA |
aucAggCode | EL41101501 | aucAggName | PETRA |
---|