StartT_UWWTPS › PT9032946

aggCode PTAGL006
repCode PT_2018
rptMStateKey PT
uwwBeginLife 01/01/05 00:00:00
uwwBOD5Perf P
uwwCapacity 54000
uwwCode PT9032946
uwwCODPerf P
uwwCollectingSystem ISCON
uwwDateClosing 10/25/18 00:00:00
uwwEndLife 12/31/18 00:00:00
uwwHistorie TP was closed in october 2018 and the effluent is treated in new TP Faro-Olhão.
uwwLatitude 37.0226784621
uwwLongitude -7.8608234824
uwwName Olhao Poente
uwwNTotPerf NR
uwwNUTS PT150
uwwOther 1
uwwOtherPerf F
uwwOtherTreatment 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks TP was closed in october 2018 and the effluent is treated in TP Faro-Olhão.
uwwSecondaryTreatment 1
uwwSpecification M Removal (maturation pound)
uwwTSSPerf NR

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode PTAGL006 aucAggName Olhao