StartT_UWWTPS › ROWP_26742_01

aggCode ROAG_26742
repCode RO07
rptMStateKey RO
uwwBadPerformance 1
uwwBeginLife 12/31/12 00:00:00
uwwBOD5Perf F
uwwBODDischargeMeasured 3
uwwBODIncomingEstimated 7
uwwCapacity 3000
uwwCODDischargeMeasured 11
uwwCode ROWP_26742_01
uwwCODIncomingEstimated 23
uwwCODPerf F
uwwCollectingSystem ISCON
uwwInformation the flow of wastewater collected is insufficient for a proper operation of the WWTP
uwwLatitude 47.0217
uwwLoadEnteringUWWTP 630
uwwLongitude 22.3957
uwwMethodWasteWaterTreated M
uwwName ROWP Statia de epurare SC Local Prest Astileu
uwwNTotPerf NR
uwwNUTS RO111
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks part of the wastewater collected from the extended collection system of the Astileu agglomeration, will be treated at the Alesd wastewater treatment plant (ROWP_26699_01)
uwwSecondaryTreatment 1
uwwState 1
uwwTSSPerf P
uwwWasteWaterTreated 118454

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode ROAG_26742 aucAggName Astileu (Pestere, Chistag)