StartT_UWWTPS › SE2181-018

aggCode SE_AGGLO_1554
repCode SE369
rptMStateKey SE
uwwBadDesign 1
uwwBOD5Perf F
uwwCapacity 6160
uwwCode SE2181-018
uwwCODPerf F
uwwCollectingSystem ISCON
uwwDateClosing 03/20/18 00:00:00
uwwEndLife 03/20/18 00:00:00
uwwHistorie FAIL BOD COD. Treatment plant closed. Wastewater is led to Jarbo avl.ren.verk, SE_AGGLO_1587, AGGLO_JARBO.
uwwInformation See the article 17 reporting
uwwLatitude 60.7609
uwwLoadEnteringUWWTP 3900
uwwLongitude 16.4929
uwwName Kungsbergets Avloppsreningsverk
uwwNTotPerf NR
uwwNUTS SE313
uwwOtherTreatment 1
uwwPRemoval 1
uwwPrimaryTreatment 1
uwwPTotPerf NR
uwwRemarks Treatment plant closed
uwwSecondaryTreatment 1
uwwState 1

Connected to the following Agglomerations (table T_UWWTPAgglos)
aucAggCode SE_AGGLO_1554 aucAggName AGGLO_KUNGSBERGET