aggBeginLife | 01/01/05 00:00:00 |
---|---|
aggBeginLife_original | 2005-01-01 |
aggC1 | 100 |
aggCalculation | The generated load of the agglomeration is equal to the organic design capacity of the treatment plant. The collecting system is fully completed and connected. |
aggChanges | no |
aggCode | CY32-Agglo |
aggGenerated | 68750 |
aggLatitude | 35.03718 |
aggLongitude | 33.98309 |
aggMethodC1 | E |
aggMethodC2 | E |
aggMethodWithoutTreatment | E |
aggName | Paralimni |
aggNUTS | CY000 |
aggPeriodOver | 20081231000000 |
aggRemarks | The collecting system is fully completed and connected. |
aggSewageNetwork | S |
aggState | 1 |
repCode | CY 2019 Art.15 |
rptMStateKey | CY |
aggDateArt3 | 12/31/08 00:00:00 |
aggDateArt4 | 12/31/08 00:00:00 |
aucUwwCode | CY31_UWWTPP | aucUwwName | Paralimni |
---|