repCode | CY 2019 Art.15 |
---|---|
rptMStateKey | CY |
uwwBeginLife | 01/01/11 00:00:00 |
uwwBOD5Perf | P |
uwwCapacity | 68750 |
uwwChlorination | 1 |
uwwCode | CY31_UWWTPP |
uwwCODPerf | P |
uwwCollectingSystem | ISCON |
uwwLatitude | 34.99097 |
uwwLoadEnteringUWWTP | 68750 |
uwwLongitude | 34.04097 |
uwwMethodWasteWaterTreated | M |
uwwName | Paralimni |
uwwNRemoval | 1 |
uwwNTotPerf | NR |
uwwNUTS | CY000 |
uwwOtherPerf | NR |
uwwOtherTreatment | 1 |
uwwPRemoval | 1 |
uwwPrimaryTreatment | 1 |
uwwPTotPerf | NR |
uwwRemarks | The uwwtp entering load in p.e. is considered the same as the organic design capacity of the plant. The collecting system is fully completed and connected. |
uwwSandFiltration | 1 |
uwwSecondaryTreatment | 1 |
uwwState | 1 |
uwwTSSPerf | NR |
uwwWasteWaterTreated | 2251945 |
aucAggCode | CY32-Agglo | aucAggName | Paralimni |
---|